One would assume the processing plant will be at one of the salars. I'm assuming here that an approximately 35km pipeline for the brines to be blended with each other would be very expensive.
Here in Australia a water pipeline costs about $9M per km, so since things are cheaper in Argentina, let's say $5M per km, so $5M x 35km = $175M AUD or approx. $120M USD, on top of all other costs. I guess that could be do-able.
Having said that, trucking the brine would be a cheaper and more flexible option. But it will mean costs per tonne of LCE for PNN won't be in the lowest percentiles, like other lithium brine operations in the area, they will be higher.
- Forums
- ASX - By Stock
- Ann: Salta Brine Blending Final Results
One would assume the processing plant will be at one of the...
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PNN (ASX) to my watchlist
|
|||||
Last
11.5¢ |
Change
-0.010(8.00%) |
Mkt cap ! $11.11M |
Open | High | Low | Value | Volume |
12.5¢ | 12.5¢ | 11.5¢ | $41.47K | 350.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 7352 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 30000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 7352 | 0.115 |
5 | 1088182 | 0.110 |
1 | 1500000 | 0.105 |
17 | 1941850 | 0.100 |
2 | 1010000 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 30000 | 1 |
0.125 | 11872 | 2 |
0.130 | 20000 | 1 |
0.135 | 20000 | 1 |
0.140 | 49217 | 4 |
Last trade - 12.13pm 18/06/2024 (20 minute delay) ? |
|
|||||
Last
11.5¢ |
  |
Change
-0.010 ( 8.00 %) |
|||
Open | High | Low | Volume | ||
12.5¢ | 12.5¢ | 11.5¢ | 115800 | ||
Last updated 13.23pm 18/06/2024 ? |
Featured News
PNN (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
SPONSORED BY The Market Online