BNL blue star helium limited

"The drilled section was completely gas filled with no water...

  1. 308 Posts.
    lightbulb Created with Sketch. 201
    "The drilled section was completely gas filled with no water being encountered during drilling. Initial flow testing was conducted with gas rates of around 115 mcfd through a ¾ inch orifice, no water was encountered during testing"

    "The forward plan is to conduct a three day flow test followed by a two day shut in and pressure survey. During testing gas samples will be collected for compositional analysis"

    Hopefully a high % of the good stuff!
    DYOR JIMHO NFA
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.7¢
Change
0.000(0.00%)
Mkt cap ! $18.86M
Open High Low Value Volume
0.7¢ 0.7¢ 0.6¢ $5.263K 808.3K

Buyers (Bids)

No. Vol. Price($)
15 6092007 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 2264924 4
View Market Depth
Last trade - 13.34pm 25/07/2025 (20 minute delay) ?
BNL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.