Nice analysis. However, I think I read that the calcrete cap on the surface prevented oxidisation of all of the rock below it. So all of that ore can be processed via the flotation circuit with very good recoveries.
Sure, the NPV looks bad at the moment, but once these other deposits are drilled out at a rapid pace, the financial metrics of this project will be transformed. The A4 deposit will be initially an open pit operation so a capital outlay for the pre-stripping of the proposed pit would be the main outlay. That won't be a large outlay in the scheme of things. Once this additional feed is put in to the mill, c1 costs will come down as the head grade will be higher and the fixed costs will be spread over more copper tonnes produced.
- Forums
- ASX - By Stock
- Ann: Sandfire Approves Development of new Long-life Copper Mine
Nice analysis. However, I think I read that the calcrete cap on...
Featured News
Add SFR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$10.22 |
Change
-0.070(0.68%) |
Mkt cap ! $4.707B |
Open | High | Low | Value | Volume |
$10.33 | $10.37 | $10.17 | $3.364M | 328.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 1693 | $10.21 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$10.22 | 2261 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 1984 | 10.200 |
17 | 3222 | 10.190 |
15 | 3415 | 10.180 |
16 | 8806 | 10.170 |
10 | 1570 | 10.160 |
Price($) | Vol. | No. |
---|---|---|
10.210 | 2705 | 20 |
10.220 | 3387 | 16 |
10.230 | 4111 | 14 |
10.240 | 3666 | 13 |
10.250 | 7042 | 11 |
Last trade - 12.44pm 19/11/2024 (20 minute delay) ? |
Featured News
SFR (ASX) Chart |