re: Ann: UCL: Sandpiper Project - Pilot Plant... Good points arsenic, I like the sound of saving costs such as you point out with CNQ. I always liked the story with the tungsten at Mt Carbine, but bailed on RAU when they couldn't land the deal and III got it.
I do have a concern about UCL's ability to raise their part of the Capex for the JV. It would be great to be able to start a simple dredging and beneficiation operation for less than the stated capex by being resourceful.
Also bullish regarding rp fundamentals, now that the lowest grade Moroccan is at $200pt, World Bank Pink Sheets out show $198.80. Hopefully we get more than $100pt for 28% Namphos if we get acceptance of the product and the right customer.
- Forums
- ASX - By Stock
- Ann: Sandpiper Project - Pilot Plant Progress
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.001(10.0%) |
Mkt cap ! $29.74M |
Open | High | Low | Value | Volume |
1.0¢ | 1.1¢ | 1.0¢ | $4.126K | 412.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 142059 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 4589025 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 142059 | 0.010 |
5 | 3756653 | 0.009 |
8 | 3605682 | 0.008 |
5 | 7990571 | 0.007 |
14 | 11456581 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 4589025 | 6 |
0.012 | 4204725 | 7 |
0.013 | 3500000 | 4 |
0.014 | 3656666 | 6 |
0.015 | 2600000 | 2 |
Last trade - 16.10pm 16/08/2024 (20 minute delay) ? |
Featured News
AEV (ASX) Chart |