My take:
117m LOM revenue
70m total operating costs (mining, processing, GA)
20m DA + taxes
28m NPAT
7m total CAPEX requirement on top of the above
therefore NPAT = 21m (base case)
The LOM numbers are different for these 2 graphs; cant reconsile them: ???
Pg 4 summary v pg 133
5 months payback (doesnt seem right - needed to check numbers)
8mil spend in 2021
+ 7mil capex build
15mil spend - therefore 1 yr payback
Base case NPAT for yr 3 is almst zero.
not much contigency
Mining not scheduled to start until 2022 - 5 year LOM
Will need to dig into this more
- Forums
- ASX - By Stock
- Ann: Santa Comba PFS Shows Exceptional Financial Economics
My take:117m LOM revenue70m total operating costs (mining,...
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RFR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online