In the majority Cooper basin is vertical unstimulated although there are horizontal and fracs there of course. Moomba is exactly the point a shared facility hub with shared facility and pipeline costs Narrabri has to carry all of this cost itself as no neighbouring projects to tie into the pipeline. Read analysts assessments of the project it is of more political value to Santos and the Feds than in dollars value. Santos also on record circa 2017 saying without a farm out they won’t go ahead and EA are far from committed
- Forums
- ASX - By Stock
- Ann: Santos welcomes IPC Narrabri Gas Project approval
In the majority Cooper basin is vertical unstimulated although...
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STO (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.69 |
Change
0.030(0.39%) |
Mkt cap ! $25.02B |
Open | High | Low | Value | Volume |
$7.61 | $7.72 | $7.58 | $22.18M | 2.894M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 27670 | $8.45 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$6.93 | 120710 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 26368 | 8.450 |
2 | 9207 | 8.300 |
1 | 1 | 8.220 |
4 | 12051 | 8.130 |
1 | 2940 | 8.080 |
Price($) | Vol. | No. |
---|---|---|
6.930 | 120710 | 4 |
7.160 | 12000 | 1 |
7.180 | 48714 | 1 |
7.270 | 26320 | 1 |
7.290 | 146712 | 11 |
Last trade - 15.59pm 30/04/2024 (20 minute delay) ? |
|
|||||
Last
$7.68 |
  |
Change
0.030 ( 0.60 %) |
|||
Open | High | Low | Volume | ||
$7.63 | $7.72 | $7.58 | 995619 | ||
Last updated 15.59pm 30/04/2024 ? |
Featured News
STO (ASX) Chart |