PRM 14.3% 0.6¢ prominence energy limited

"Drilling is now underway on the 17-1/2” intermediate hole...

  1. 218 Posts.
    lightbulb Created with Sketch. 7
    "Drilling is now underway on the 17-1/2” intermediate hole section to a
    depth of 2030m (BMSL), 13-3/8” casing will then be run and cemented"

    Wondering and interesting.
    when 13-3/8" casing at 2030m, could we smell something ? as the target thickness is from 2000m to 2500m.

 
watchlist Created with Sketch. Add PRM (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
-0.001(14.3%)
Mkt cap ! $1.171M
Open High Low Value Volume
0.7¢ 0.7¢ 0.6¢ $616 93.39K

Buyers (Bids)

No. Vol. Price($)
5 1588825 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 327081 1
View Market Depth
Last trade - 15.18pm 03/05/2024 (20 minute delay) ?
Last
0.6¢
  Change
-0.001 ( 14.3 %)
Open High Low Volume
0.6¢ 0.6¢ 0.6¢ 117700
Last updated 14.37pm 03/05/2024 ?
PRM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.