Inital Capex of about $160 Million is about twice Rocket's estimate.
Ongoing Capex about $40 per tonne of pellets, when added to C1 costs, bumps up the ongoing real cost of production quite substantially.
Underground risks seem high. Remember, there are humans driving the trucks down there.
Still, if pellet prices stay elevated, the next ten years should be profitable.
- Forums
- ASX - By Stock
- Ann: Savage River Underground Prefeasibility Study Results
Inital Capex of about $160 Million is about twice Rocket's...
-
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
27.3¢ |
Change
-0.008(2.68%) |
Mkt cap ! $318.2M |
Open | High | Low | Value | Volume |
27.5¢ | 28.0¢ | 27.0¢ | $231.6K | 851.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 362659 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
27.5¢ | 267590 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 362659 | 0.270 |
10 | 201720 | 0.265 |
7 | 230289 | 0.260 |
8 | 222648 | 0.255 |
15 | 517552 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.275 | 268026 | 10 |
0.280 | 130762 | 7 |
0.285 | 60767 | 4 |
0.290 | 68585 | 4 |
0.295 | 212818 | 6 |
Last trade - 13.47pm 01/10/2024 (20 minute delay) ? |
Featured News
GRR (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online