The main takeaways for me are it will be 2H 2023 before any final decisions are made so no drain on cash for some time regarding SR, and it contains at least 10years of Ore. Also of note is the maximum capacity for the pipeline is 2.75 mtpa so how the UG and current pit operations work in together with regards to total LOM is not really clear but can only be worked around pipeline capacity...
Cheers Whisky
- Forums
- ASX - By Stock
- GRR
- Ann: Savage River Underground Prefeasibility Study Results
Ann: Savage River Underground Prefeasibility Study Results, page-7
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
30.0¢ |
Change
0.005(1.69%) |
Mkt cap ! $347.2M |
Open | High | Low | Value | Volume |
30.0¢ | 30.0¢ | 29.5¢ | $237.6K | 796.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 39651 | 29.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.0¢ | 29998 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 39651 | 0.295 |
13 | 287130 | 0.290 |
10 | 187386 | 0.285 |
31 | 1155312 | 0.280 |
10 | 275787 | 0.275 |
Price($) | Vol. | No. |
---|---|---|
0.300 | 29998 | 1 |
0.305 | 151997 | 5 |
0.310 | 80723 | 6 |
0.315 | 189855 | 4 |
0.320 | 109752 | 5 |
Last trade - 16.10pm 22/08/2024 (20 minute delay) ? |
Featured News
GRR (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
SPONSORED BY The Market Online