PAN 0.00% 3.5¢ panoramic resources limited

Ann: Savannah Nickel Project - Operational Update, page-54

  1. 4,212 Posts.
    lightbulb Created with Sketch. 76
    Pressure plate needs to be repaired/replaced no later than two weeks, otherwise serious potential downside risk. Agree with poster who said there should have been replacement parts available onsite, and doesn't show very high level of management of machinery maintenance.
 
watchlist Created with Sketch. Add PAN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.