I think that the resource upgrade may have caused a lot of other parameters in the DFS to change, we know for sure LOM will be increased but they also may be updating the ore per day from 2600 to a much larger number which in turn starts causing a cascading effect on things like the size of the concentrator where to store the extra tailings and water management. In order to take advantage of the huge increase they will want to maximize the DFS and if it takes a bit more time to figure that all out, I am good. It is better to have these issues figured out now than to do it once you are in production. I remember Galaxy updating their flow sheet after resumption of production and it caused tons of down time and poor processing... nope lets get it right from the get-go.
- Forums
- ASX - By Stock
- Ann: Sayona Doubles Quebec Lithium Resource Base
I think that the resource upgrade may have caused a lot of other...
-
-
- There are more pages in this discussion • 435 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
|
|||||
Last
3.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $349.9M |
Open | High | Low | Value | Volume |
3.4¢ | 3.5¢ | 3.4¢ | $865.3K | 25.27M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
58 | 13685029 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 8358754 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
58 | 13685029 | 0.034 |
104 | 19679967 | 0.033 |
103 | 26843384 | 0.032 |
40 | 19250601 | 0.031 |
91 | 18643735 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 8358754 | 14 |
0.036 | 5152143 | 14 |
0.037 | 4301963 | 13 |
0.038 | 3637875 | 16 |
0.039 | 3563973 | 18 |
Last trade - 16.10pm 02/07/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |