SDV 9.00% 54.5¢ scidev ltd

Ann: SciDev Chemistry Trial at BHP Olympic Dam, page-19

  1. 4,283 Posts.
    lightbulb Created with Sketch. 688
    I've operated a few systems just like this, looks fairly standard to me. A probe continually measures the turbidity after picking up from the sludge collector and the PLC activates the floc dosing pump if above the set point and perhaps adjusts the flowrate of the VSD to allow settling while dosing.

    Thanks for that, I haven't read as far back as 2017 yet however it's on my todo list.
 
watchlist Created with Sketch. Add SDV (ASX) to my watchlist
(20min delay)
Last
54.5¢
Change
0.045(9.00%)
Mkt cap ! $103.4M
Open High Low Value Volume
50.0¢ 55.5¢ 49.8¢ $235.2K 448.4K

Buyers (Bids)

No. Vol. Price($)
1 2282 54.5¢
 

Sellers (Offers)

Price($) Vol. No.
55.0¢ 5100 1
View Market Depth
Last trade - 16.10pm 13/09/2024 (20 minute delay) ?
SDV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.