JMS 3.03% 32.0¢ jupiter mines limited.

Ann: Scoping Study-High Purity Manganese Sulphate Project, page-9

  1. 27 Posts.
    lightbulb Created with Sketch. 14
    some here are missing the fact they Jupiter doesn’t control Tsipi mine, Jupiter needs the ore product, and the transport etc…,there should be no assumptions because Jupiter has no control of a mine and it is just a shareholder of one.

    without the control of the mine and the mined product and access to transport, then the supply of ore could go to another processing plant in the long term.

    if jupiter built and ran this processing plant alone, they would go from a mining company to a chemical processing company, and would then be at the mercy of mines that supply the ore, including Tsipi.

    after having a close look at this , the idea of Jupiter going this alone and paying for all the research and study, and possibly even the entire plant construction, just doesn’t make sense.
    Last edited by TenthMan: 15/03/24
 
watchlist Created with Sketch. Add JMS (ASX) to my watchlist
(20min delay)
Last
32.0¢
Change
-0.010(3.03%)
Mkt cap ! $627.2M
Open High Low Value Volume
32.5¢ 33.0¢ 31.5¢ $1.022M 3.170M

Buyers (Bids)

No. Vol. Price($)
2 39945 32.0¢
 

Sellers (Offers)

Price($) Vol. No.
32.5¢ 46167 2
View Market Depth
Last trade - 16.10pm 06/06/2024 (20 minute delay) ?
Last
32.0¢
  Change
-0.010 ( 1.54 %)
Open High Low Volume
33.0¢ 33.0¢ 31.8¢ 1137159
Last updated 15.59pm 06/06/2024 ?
JMS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.