some here are missing the fact they Jupiter doesn’t control Tsipi mine, Jupiter needs the ore product, and the transport etc…,there should be no assumptions because Jupiter has no control of a mine and it is just a shareholder of one.
without the control of the mine and the mined product and access to transport, then the supply of ore could go to another processing plant in the long term.
if jupiter built and ran this processing plant alone, they would go from a mining company to a chemical processing company, and would then be at the mercy of mines that supply the ore, including Tsipi.
after having a close look at this , the idea of Jupiter going this alone and paying for all the research and study, and possibly even the entire plant construction, just doesn’t make sense.
- Forums
- ASX - By Stock
- Ann: Scoping Study-High Purity Manganese Sulphate Project
some here are missing the fact they Jupiter doesn’t control...
-
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add JMS (ASX) to my watchlist
(20min delay)
|
|||||
Last
18.3¢ |
Change
0.013(7.35%) |
Mkt cap ! $343.0M |
Open | High | Low | Value | Volume |
18.0¢ | 18.3¢ | 17.3¢ | $747.1K | 4.181M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 248823 | 18.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.5¢ | 1306297 | 43 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 248823 | 0.180 |
8 | 289857 | 0.175 |
15 | 602536 | 0.170 |
16 | 597424 | 0.165 |
24 | 2026347 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.185 | 1306059 | 42 |
0.190 | 1381294 | 15 |
0.195 | 445027 | 5 |
0.200 | 361951 | 5 |
0.205 | 130000 | 2 |
Last trade - 11.30am 27/09/2024 (20 minute delay) ? |
Featured News
JMS (ASX) Chart |