VR8 0.00% 5.6¢ vanadium resources limited

Time delay of the project to the production faze very...

  1. 757 Posts.
    lightbulb Created with Sketch. 102
    Time delay of the project to the production faze very favorable:

    " From commencement of construction it has been assumed, based on current equipment availability, that the initial concentrate can be produced from the Project via dry magnetic separation after 5 months. Production of the refined concentrate product would take a further 4 - 5 months to commence."
 
watchlist Created with Sketch. Add VR8 (ASX) to my watchlist
(20min delay)
Last
5.6¢
Change
0.000(0.00%)
Mkt cap ! $31.50M
Open High Low Value Volume
5.7¢ 5.7¢ 5.6¢ $3.481K 61.51K

Buyers (Bids)

No. Vol. Price($)
1 1 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.0¢ 22135 1
View Market Depth
Last trade - 13.10pm 09/07/2024 (20 minute delay) ?
VR8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.