E25 1.69% 29.0¢ element 25 limited

The scoping study notes the location as being something still...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,003 Posts.
    lightbulb Created with Sketch. 6658
    The scoping study notes the location as being something still under consideration.
    https://hotcopper.com.au/data/attachments/4046/4046486-1e0c2b9da1307f12ea9e4916ab0766c5.jpg
    With both EGR and RNU having managed to get conditional export Australia funding (and significant sum's at US$40m and A$185m), what is the probability of E25 following that same path - major project status then Export Australia funding?
    • Major Pro's - Reduced shareholder dilution to fund the project. Recognition as an important project nationally for Australia
    • Major Con's - Site locations are restricted to Australia. Possibly more red tape to get through to secure the funding.

    https://business.gov.au/grants-and-programs/major-project-status/current-major-projects

    One of the previous barrier's to applying was needing to supply cost estimates from feasibility studies. E25 didn't have a feasibility study. E25 now got a scoping study and a feasibility study is in the works. The capital cost threshold of A$50m is clearly met at circa A$200m capital cost. Export benefits, Jobs etc would all be met from an Australian location.
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
29.0¢
Change
-0.005(1.69%)
Mkt cap ! $63.77M
Open High Low Value Volume
29.5¢ 29.8¢ 26.5¢ $272.0K 972.1K

Buyers (Bids)

No. Vol. Price($)
1 4551 28.5¢
 

Sellers (Offers)

Price($) Vol. No.
29.0¢ 19999 1
View Market Depth
Last trade - 16.10pm 18/10/2024 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.