E25 2.22% 22.0¢ element 25 limited

The scoping study notes the location as being something still...

  1. 2,734 Posts.
    lightbulb Created with Sketch. 5924
    The scoping study notes the location as being something still under consideration.
    https://hotcopper.com.au/data/attachments/4046/4046486-1e0c2b9da1307f12ea9e4916ab0766c5.jpg
    With both EGR and RNU having managed to get conditional export Australia funding (and significant sum's at US$40m and A$185m), what is the probability of E25 following that same path - major project status then Export Australia funding?
    • Major Pro's - Reduced shareholder dilution to fund the project. Recognition as an important project nationally for Australia
    • Major Con's - Site locations are restricted to Australia. Possibly more red tape to get through to secure the funding.

    https://business.gov.au/grants-and-programs/major-project-status/current-major-projects

    One of the previous barrier's to applying was needing to supply cost estimates from feasibility studies. E25 didn't have a feasibility study. E25 now got a scoping study and a feasibility study is in the works. The capital cost threshold of A$50m is clearly met at circa A$200m capital cost. Export benefits, Jobs etc would all be met from an Australian location.
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
22.0¢
Change
-0.005(2.22%)
Mkt cap ! $47.85M
Open High Low Value Volume
22.5¢ 23.0¢ 22.0¢ $35.32K 156.7K

Buyers (Bids)

No. Vol. Price($)
1 20000 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.5¢ 2127 1
View Market Depth
Last trade - 15.17pm 28/06/2024 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.