AGE 0.00% 5.0¢ alligator energy limited

Ann: Scoping Study - Samphire Uranium Project, page-11

  1. 661 Posts.
    lightbulb Created with Sketch. 220
    I think you are paying $110mil for a $180mil project that is at best 5 years away and very marginal.
    I have always said this is an exploration project not a development project but AGE keep beating that drum.
    Blackbush is the geochemical anomaly, not the mine.
    Plus the connection between Blackbush and Plumbush needs to be determined.
    Explore these 2, if you can't increase the tonnage AND grade, move on.
    That's what I would do
 
watchlist Created with Sketch. Add AGE (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.000(0.00%)
Mkt cap ! $193.4M
Open High Low Value Volume
5.0¢ 5.1¢ 4.8¢ $588.9K 11.93M

Buyers (Bids)

No. Vol. Price($)
26 4330332 4.8¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 143691 1
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
AGE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.