The results of the additional drilling were used to establish a new Mineral Resource Estimate (MRE)
for the Blackbush deposit in October 2022, which was further updated in March 2023. The latest
MRE totals 18.1Mlbs at a cut-off grade of 250ppm U3O8 from 11.4Mt @ 720ppm and includes a
significant proportion (60%) in the Indicated category. This, along with the favourable bench-scale
test results, have been incorporated into the Scoping Study based upon the in-situ recovery mining
(ISR) method with a 10.0 Mlbs U3O8 total Production Target at the Blackbush deposit, and annual
production targeting 1Mlbs pa U3O8 with a ramp up and ramp down as shown below.
They will do far more dilling here and the scoping study will be updated .. this is a starting point based on current resource.
- Forums
- ASX - By Stock
- Ann: Scoping Study - Samphire Uranium Project
The results of the additional drilling were used to establish a...
Featured News
Add AGE (ASX) to my watchlist
|
|||||
Last
5.0¢ |
Change
-0.002(3.85%) |
Mkt cap ! $193.4M |
Open | High | Low | Value | Volume |
5.1¢ | 5.2¢ | 5.0¢ | $340.7K | 6.686M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
54 | 9962296 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 288378 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
51 | 8842296 | 0.050 |
15 | 3364449 | 0.049 |
11 | 2434320 | 0.048 |
4 | 1610638 | 0.047 |
3 | 106000 | 0.046 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 288378 | 5 |
0.052 | 1177586 | 4 |
0.053 | 252860 | 3 |
0.054 | 872170 | 6 |
0.055 | 1838903 | 6 |
Last trade - 16.10pm 24/06/2024 (20 minute delay) ? |
Featured News
AGE (ASX) Chart |