Now that is what we are looking for. A potential low CAPEX and low OPEX operation.....No Jetty structure required at the moment vastly reducing risk and cost. Also prudent to add in a overland conveyor as a second stage to reduce haul distance and OPEX. I am interested to see the studies undertaken to a more detailed level (+/-15%) to fully understand the economics of this project.
This shows how low ball the 5 cent offer is, mind you the 5 cent offer was better than Base's offer.
IMHO there is a lot more value in this project than the 5 cents offered.
GLTA.
- Forums
- ASX - By Stock
- Ann: Scoping Study
Now that is what we are looking for. A potential low CAPEX and...
Featured News
Add WTR (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online