WTR 0.00% 8.0¢ world titanium resources limited

Now that is what we are looking for. A potential low CAPEX and...

  1. 308 Posts.
    lightbulb Created with Sketch. 56
    Now that is what we are looking for. A potential low CAPEX and low OPEX operation.....No Jetty structure required at the moment vastly reducing risk and cost. Also prudent to add in a overland conveyor as a second stage to reduce haul distance and OPEX. I am interested to see the studies undertaken to a more detailed level (+/-15%) to fully understand the economics of this project.

    This shows how low ball the 5 cent offer is, mind you the 5 cent offer was better than Base's offer.

    IMHO there is a lot more value in this project than the 5 cents offered.

    GLTA.
 
watchlist Created with Sketch. Add WTR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.