Sundance Resources is seeking to develop its flagship Mbalam-Nabeba Iron Ore Project, which straddles the border of Cameroon and the Republic of Congo in Central Africa. Stage One will be the production of a Direct Shipping Ore (“DSO”)-quality sinter fines product averaging >62.0% Fe at a rate of 40Mtpa for approximately 14 years based on blending material sourced from the deposits in the neighbouring countries of Cameroon and Congo. Stage Two, which is currently at a Pre-Feasibility Stage, would then extend the life of the operation by further 15-plus years producing high-grade Itabirite hematite concentrate. In April 2011, Sundance completed the Definitive Feasibility Study for Stage One and PreFeasibility Study for Stage Two of the Mbalam-Nabeba Iron Ore Project. The Project will utilise the rail and port infrastructure to be financed, built and owned by the Government of Cameroon, a 540km rail line dedicated to the transport of iron ore through Cameroon and a dedicated mineral export terminal designed for taking bulk iron ore carriers of up to 300,000 tonnes.
- Forums
- ASX - By Stock
- Ann: SDL: Market Update: Placement Agreement
Sundance Resources is seeking to develop its flagship...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ANS (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online