Puts SDM on a PE of 8 and likely to pay a 6c final div. Problem is the macro for new coal developments (SDM's speciality) is deteriorating rapidly and i wonder how much of SDM's 'pipeline' will ever be converted into actual contracts. FGE my preferred choice in mid-size engineering sector.
- Forums
- ASX - By Stock
- SDM
- Ann: SDM Trading Update
Ann: SDM Trading Update , page-4
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)