Correct Barrier!
First shipment next month will be circa 30Kt. Do the math @ US200/t = first cash flow of US$6m (say A$7.7m)
It’s a Brazilian Cash Cow!
Regards
Pihrana
- Forums
- ASX - By Stock
- Ann: Second Infill Drill Results
Correct Barrier!First shipment next month will be circa 30Kt. Do...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TI1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.208M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TI1 (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online