Second rig commencing on site on Thursday.
They have drilled 30 holes for 4650m with one rig in four weeks, down to depths of 200m and beyond (288m in one hole).
Historic drilling appears to have only been to around 40m (as it was sterilisation drilling at the time) and hit 2% lithium mineralisation at EOH.
Giggity
- Forums
- ASX - By Stock
- Ann: SECOND RC DRILL RIG MOBILISING TO TABBA TABBA
Second rig commencing on site on Thursday.They have drilled 30...
-
- There are more pages in this discussion • 169 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WC8 (ASX) to my watchlist
(20min delay)
|
|||||
Last
24.0¢ |
Change
-0.030(11.1%) |
Mkt cap ! $289.5M |
Open | High | Low | Value | Volume |
25.5¢ | 25.5¢ | 23.5¢ | $1.041M | 4.257M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 164418 | 23.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
24.0¢ | 35664 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 164418 | 0.235 |
4 | 41738 | 0.230 |
6 | 206666 | 0.225 |
10 | 87652 | 0.220 |
4 | 134630 | 0.215 |
Price($) | Vol. | No. |
---|---|---|
0.240 | 35664 | 1 |
0.245 | 37424 | 1 |
0.250 | 145120 | 5 |
0.255 | 248049 | 3 |
0.260 | 52884 | 3 |
Last trade - 16.10pm 08/08/2024 (20 minute delay) ? |
Featured News
WC8 (ASX) Chart |