Bit of info on Bald Hill for those interested.
They (Lithco) were still mining there in May this year with big expansion plans. Four diggers and 14 trucks were operating.
Exploration (RC) rigs commenced drilling to the sth of the of the current two pits. The Bald Hill waste dump is to the Nth, so my logic tells me it's not "open to the Nth. Also, the Nth pit itself was virtually mined out.
They had drill/blast to the East and a digger out that way. The main operation, though, was moving sth.
- Forums
- ASX - By Stock
- TOR
- Ann: Second Rig Mobilised to New Dawn Lithium Project
Ann: Second Rig Mobilised to New Dawn Lithium Project, page-18
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TOR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.3¢ |
Change
-0.002(2.35%) |
Mkt cap ! $15.64M |
Open | High | Low | Value | Volume |
8.3¢ | 8.3¢ | 8.1¢ | $53.56K | 653.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 137687 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.3¢ | 11908 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 137687 | 0.080 |
1 | 45500 | 0.077 |
2 | 300000 | 0.076 |
3 | 538346 | 0.075 |
3 | 45410 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 11908 | 1 |
0.085 | 110000 | 2 |
0.090 | 50000 | 1 |
0.091 | 50000 | 1 |
0.092 | 50000 | 1 |
Last trade - 15.38pm 27/09/2024 (20 minute delay) ? |
Featured News
TOR (ASX) Chart |