Interesting reading this afternoon. Timing is essential in this situation. Wait for final report of IP survey and drilling recommendations. Then wait until July 15 to ensure S32 are out of the picture. Much speculation but none of us have seen the JV contract. Given that S32 are out, then ICG can select targets and apply for drilling permit with actual co -ordinates. IF BOD cannot bring in a JVP then must have a CR to fund a drill campaign this year. I am as impatient as many of the posters, however, impatience won't change the current timetable that the BOD have to adhere to.
Cheers Rob
- Forums
- ASX - By Stock
- Ann: Second Round of Integrated Results from Riqueza
Interesting reading this afternoon. Timing is essential in this...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.633M |
Open | High | Low | Value | Volume |
0.7¢ | 0.8¢ | 0.7¢ | $2.622K | 371.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 733777 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 2189941 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 733777 | 0.007 |
2 | 1453050 | 0.006 |
7 | 1421110 | 0.005 |
8 | 2487620 | 0.004 |
4 | 2766780 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 1939941 | 4 |
0.009 | 540000 | 2 |
0.010 | 299998 | 1 |
0.011 | 350000 | 1 |
0.013 | 290000 | 1 |
Last trade - 15.50pm 28/06/2024 (20 minute delay) ? |
Featured News
ICG (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online