Attritioning step is at the WCP. You can see in the photo on page 2 of the annual report. The recent update is pretty poorly worded and makes it sound like it might happen at the MSP.
"The improvement initiatives, as outlined in the previous quarterly report, include improving sand tailings deposition and rectification of MSP issues including dust extraction, dryer-heater controls, as well as conditioning of the HMC. The MSP is designed to separate the HMC into the valuable critical minerals of Zircon, Titanium (Rutile and Ilmenite) as well as a ZIC product.
Modification works have recently been completed to the WCP on the upstream mineral cleaning circuit of the HMC (refer Figure 1). Results to date show a significant improvement in separation efficiency and further optimisation of the circuit is continuing."
- Forums
- ASX - By Stock
- STA
- Ann: Second Shipment of Chloride Ilmenite Completed at Coburn
Ann: Second Shipment of Chloride Ilmenite Completed at Coburn, page-17
-
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
SKS
SKS Technologies wins US$90M award to supply power to international hyperscale data centre in Melbourne
TLX
Telix jumps 11.6% as US government indicates proposed medicare changes won't affect prostate cancer drug
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable