If the ilmenite shipment is STA cargo it indicates some production improvement.
Table uses September quarter hmc production rate to extrapolate October ilmenite production.
Could be higher throughput at wcp or better recovery there.
Possibly the improved attritioning is allowing them to cut more mags to the ilmenite product.
The AAL Nanjing cargo is now shown as zircon on the Geraldton port site, previously shown as zircon sand.
kcf
- Forums
- ASX - By Stock
- STA
- Ann: Second Shipment of Chloride Ilmenite Completed at Coburn
Ann: Second Shipment of Chloride Ilmenite Completed at Coburn, page-22
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online