STA 0.00% 9.5¢ strandline resources limited

Ann: Second Shipment of Chloride Ilmenite Completed at Coburn, page-27

  1. kcf
    359 Posts.
    lightbulb Created with Sketch. 27
    No idea what is happening onsite.

    I'd guess the cost of operating the dry mill would be looked at though.
    Randall Graves: "The cost to operate the MSP in the DFS is about $2m a quarter so some of the increase would be running both the MSP and WCP but surely they aren't out by 500% on MSP opex."
    kcf
 
watchlist Created with Sketch. Add STA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.