Berth 6 for incoming, Iluka hmc from Eucla basin operations.
Berth 4 for outgoing cargos, not setup to receive / unload bulk cargo.
Would be handy to know the grade of the hmc going out..a good indicator of how the concentrator is going.
From the announcement: From a production perspective, improving plant and equipment availability and optimising product recoveries continues to be a key priority for commissioning and operational teams.
The msp will want 95% hm as indicated in presentations.
kcf
- Forums
- ASX - By Stock
- STA
- Ann: Second Shipment of HMC Completed at Coburn Project
Ann: Second Shipment of HMC Completed at Coburn Project, page-22
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable