Under heading Summary of the Bridging Loan, page 15 dot point middle of page:
"receipt of a Competing Proposal or failure of the Scheme to be implemented are not events of default under the Bridging Loan;"
- Forums
- ASX - By Stock
- RAP
- Ann: Second Supplementary Scheme Booklet
Ann: Second Supplementary Scheme Booklet, page-43
-
- There are more pages in this discussion • 213 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)