SYR should be north of $5 in 12 months when they get their Vidalia plant into commercial operation. The build will be finished in 5 months but allow 3-6 months to tune it up.
They had a month long strike at their Balama mine last qtr driving up their C1 costs and restricting their sales so instead of being in profit they made a loss tanking the SP. With shipping availability nearly back to normal and the price plummeting back to historic levels (up 4x during the shortage) they should finally show a profit this qtr barring anything else going wrong.
The weighted average price they are now getting has gone up every qtr from $480 to $716 last year (see below). The 162kt sold for the year was a record but the inflated shipping costs put a dampener on making a profit along with everything else. Almost there.
- Forums
- ASX - By Stock
- Ann: Section 708A Cleansing Statement
SYR should be north of $5 in 12 months when they get their...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CSE (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $20.80M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CSE (ASX) Chart |
Day chart unavailable