NB, as i read it the construction is only just commencing, so Q3 11/12 is when the work and billing will be done. Good announcement but means nothing for the current issues. Essentially this is a bit of "pipeline" annoucnement as well.
How could they stuff up the Tassie announcment so badly. Timing you can argue is out of their control, but the things in their control are not being managed well.
I asked a second time at the AGM about a CR and was assured there were three contingencies. I also questioned them about their measure of "success" for management which I was assured was in the process of being addressed.
Personally afterwards Plympton told me to "stick with us" with a nod and a wink as if they had an ace up their sleeves. Yet he has not bought a share. The evidence was there if I had known where to look. Very, very disappointed.
- Forums
- ASX - By Stock
- DMC
- Ann: Secures new Embedded Network contract
Ann: Secures new Embedded Network contract , page-5
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DMC (ASX) to my watchlist
|
|||||
Last
30.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
DMC (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online