I'm unhappy with the SS delays. AD comes from an engineering background and generalization is that engineers usually consider all variables (rightly or wrongly). It a way it is good they are considering everything, but bad in the sense this is going to add further delays to the SS. Why not do an interim SS for the high grade and then updated it further down the track. If the SS is delayed, then the DFS study will also be delayed as it relies on info from the SS to compile the info. Make no mistake, this going to be a long slow burn. Good for the SP manipulators, but bad for retail SH who rely on news for a higher SP.
- Forums
- ASX - By Stock
- CHN
- Ann: Seismic Identifies Potential 1.6km Extension of Gonneville
Ann: Seismic Identifies Potential 1.6km Extension of Gonneville, page-18
-
- There are more pages in this discussion • 112 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CHN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.00 |
Change
0.040(4.17%) |
Mkt cap ! $389.0M |
Open | High | Low | Value | Volume |
98.0¢ | $1.03 | 98.0¢ | $3.138M | 3.104M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 54202 | $1.00 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.02 | 31729 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 54202 | 1.000 |
1 | 10000 | 0.990 |
2 | 14247 | 0.985 |
4 | 46811 | 0.980 |
2 | 30310 | 0.975 |
Price($) | Vol. | No. |
---|---|---|
1.020 | 30000 | 2 |
1.025 | 31228 | 3 |
1.030 | 839 | 2 |
1.040 | 12000 | 2 |
1.050 | 23400 | 3 |
Last trade - 16.10pm 16/08/2024 (20 minute delay) ? |
Featured News
CHN (ASX) Chart |