https://www.hydrocarbons-technology.com/projects/seronolng/
This is a précis of the structure of the Donggi-Senoro business.
The pipeline proposal between it and Sengkang is more difficult to find info about but it’s available and no timeline set.
This https://www.ogj.com/pipelines-transportation/lng/article/17284823/tokyo-gas-to-buy-stake-in-indonesias-sengkang-project is when R. Priyono rejects the LNG plant project at Sengkang. R. Priyono is no longer available for negotiations within the Indonesian gas sector having been removed by the anti corruption commission of Indonesia.
- Forums
- ASX - By Stock
- EWC
- Ann: Sengkang Power Plant
Ann: Sengkang Power Plant, page-29
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.1¢ |
Change
0.001(5.00%) |
Mkt cap ! $64.65M |
Open | High | Low | Value | Volume |
2.0¢ | 2.1¢ | 2.0¢ | $14.03K | 690.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 38005 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 249747 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 38005 | 0.020 |
4 | 1053984 | 0.018 |
2 | 3020000 | 0.017 |
1 | 250000 | 0.015 |
1 | 50000 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.021 | 249747 | 1 |
0.022 | 25181 | 1 |
0.023 | 210528 | 1 |
0.025 | 400000 | 1 |
0.027 | 659708 | 3 |
Last trade - 16.10pm 07/11/2024 (20 minute delay) ? |
Featured News
EWC (ASX) Chart |