I think he is saying "as well as".
because this is the main work to come in 4 weeks. Chemical Grade
"Next Metallurgical Test Work Steps: • Precipitation of Li2CO3; first test complete, results pending • Purification by bicarbonation • Preparation of LiOH The precipitation of Li2CO3 and preparation of LiOH are the final steps in Dakota’s sighter metallurgical study with Dorfner-Anzaplan, to demonstrate that petalite material from Sepeda can produce both a technical grade and a chemical grade lithium product via conventional, commercially tested methods. As outlined above, a final report with full details of the hydro-metallurgical test work is scheduled for completion at the end of May 2017."
I think he is saying "as well as". because this is the main work...
Add to My Watchlist
What is My Watchlist?