Highlights:
• Phase Three drilling well under way, with four drill rigs now operational
• Approximately 17 holes for 2,000m completed to date
• Drill plan for Phase Three is for 9,000m over 47 holes, including 4,500m of diamond core drilling
• Drilling will facilitate a Resource update in CY Q3 2017, as well as detailed metallurgical testwork to be used in a Feasibility Study.
The drilling is designed to infill and extend the maiden Resource at the Romano pegmatite, announced by Dakota on the 20th of February 2017, as well as to continue testing other pegmatites within the Carvalhais Pegmatite Swarm at Sepeda
- Forums
- ASX - By Stock
- DKO
- Ann: Sepeda Lithium Project Update on Phase Three Drilling
Ann: Sepeda Lithium Project Update on Phase Three Drilling, page-3
-
- There are more pages in this discussion • 63 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DKO (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online