Highlights:
I especially like "the most significant to date being 93m of total downhole pegmatite width intersected in SC024, made up of two intersections of 30 and 63m".
- Phase two resource drilling concluded at Sepeda lithium project – very wide, mineralised pegmatites intersected
- Drilled strike extent of Romano pegmatite now approximately 800m and still open in all directions.
- Drilling to continue in Q1 2017 over Romano and other pegmatites
- Maiden resource on track for Q1 2017
- Re-analysis of samples from phase one drilling has upgraded weighted average lithium grade from 1.31% to 1.37% Li2O
- Forums
- ASX - By Stock
- DKO
- Ann: Sepeda Phase2 Drilling Extends Lithium MineralisedPegmatites
Ann: Sepeda Phase2 Drilling Extends Lithium MineralisedPegmatites, page-3
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)