FMG 0.99% $22.40 fortescue ltd

Ann: September 2023 Quarterly Production Report, page-5

  1. 442 Posts.
    lightbulb Created with Sketch. 177
    The report looks good without it being too exciting.

    Does anyone remember what the total costs of production is? C1 is just the bare basics. I have a feeling that it is around 55AUD per tonne our break even point? But again I feel it is too low especially considering exchange rates.

    Also lets hope they sort out the pipeline issues. Just a paltry 40,000 tonnes exported with Iron bridge ore and that was way back in early July.
    1.1 million tonnes mined last quater and 2.2 million tonnes mined this quater you would expect something like a 500,000- to a million tonnes of ore getting sold in the 2nd quater. Again I would love to know what is the expected break even point for ore per tonne from Iron bridge.
    Last edited by tris06: 26/10/23
 
watchlist Created with Sketch. Add FMG (ASX) to my watchlist
(20min delay)
Last
$22.40
Change
-0.225(0.99%)
Mkt cap ! $69.06B
Open High Low Value Volume
$22.36 $22.61 $22.31 $49.97M 2.223M

Buyers (Bids)

No. Vol. Price($)
8 596 $22.39
 

Sellers (Offers)

Price($) Vol. No.
$22.40 10181 33
View Market Depth
Last trade - 15.15pm 05/07/2024 (20 minute delay) ?
FMG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.