Just a reminder that it is now November!"The Scoping Study is...

  1. 2,424 Posts.
    lightbulb Created with Sketch. 1628
    Just a reminder that it is now November!

    "The Scoping Study is expected to be delivered to the Company in early November 2022."

    There is the line I didn't notice about "specifically the capacity fo existing infrastructure to truck 2-3Mt per annum of DSO".

    We know they will need at least 60km of road to get to the main highway.

    Let's see what else will be needed for in / around Toliara to support this.

    You need to go through the city to get to the port, so perhaps a bypass road is not feasible. Unless the company decides to build their own facilities for barging (as Paul alluded to previously), and then a higher volume, long term solution as production scales.

    In theory 100 trucks per day (as per https://hotcopper.com.au/threads/ako-general-discussion.6779410/page-166?post_id=64490552) would drive past a persons house in about 5 minutes if they were in a convoy and travelling 30km/h.

    In saying this, we assume that the trucks will aim to do 2 trips per day, which would reduce this disruption.

    So long as the roads are ok, and the traffic isn't too crazy, the existing roads should be able to cover it.

    Anyways, hopefully we get the details in the next 2 weeks.

    https://hotcopper.com.au/data/attachments/4798/4798606-78ddc3c98cde6a56259397ebd35caeb8.jpg
 
watchlist Created with Sketch. Add AKO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.