TDO 1.39% 7.1¢ 3d energi limited

Results? Seismic survey initial processing will be 4+ months,...

  1. 4,610 Posts.
    lightbulb Created with Sketch. 1419
    Results? Seismic survey initial processing will be 4+ months, companies will do their own checks and processing.
    Multiple new targets will be defined, current targets sizes refined and assessed for possible gas indicators.

    The survey acquired an area of approximately 1700 km2. Commencing in late August 2021 and
    finishing at midnight on 31 October 2021 in accordance with the approved Environment Plan
    from NOPSEMA, the Sequoia survey was hampered by poor weather which in addition to
    further EP conditions resulted in a total area less than the approved 2450km2, however
    acquisition was prioritised and the JV successfully retrieved data over the most prospective
    areas and as such all pre-existing leads were covered (Fig.1 and Table 1)

    All current leads was covered, the area between Whistler and Flanagan was covered extensively.
 
watchlist Created with Sketch. Add TDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.