re: Ann: Settlement of Brazil Phosphate Proje... From the 18/06/10 ann:
"An auger drilling rig has now been mobilised to site. Drilling will target a combination of the best soil and surface rock chip sampling results. Results from this drilling are expected in late June."
May surprise this week.