"STA basket price sold in 7th shipment is 33% above forecast for DFS so the numbers should still be relevant as is."... that is a little bit optimistic I'm afraid. Last shipment was probably skewed towards zircon-rutile due to extracting ilmenite through the MSP commissioning as released. Otherwise, with Coburn, Thunderbird then Balranald coming on-line next year into a China-global slowdown analysts are walking back their min sand prices assumptions. especially zircon.
Ilm and Rut should stay above DFS imo, zircon more at risk. Still, DFS pricing is lower than some other developers which provides confidence of hitting DFS margins so long as tech issues are sorted out.
- Forums
- ASX - By Stock
- STA
- Ann: Seventh Shipment of HMC Completed at Coburn Project
Ann: Seventh Shipment of HMC Completed at Coburn Project, page-94
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online