Thanks
"Last shipment was probably skewed towards zircon-rutile due to extracting ilmenite through the MSP commissioning as released."
I thought the MSP commissioning was an ongoing thing, therefore basket prices should remain at current levels if not better due to end product sales.
- Forums
- ASX - By Stock
- STA
- Ann: Seventh Shipment of HMC Completed at Coburn Project
Ann: Seventh Shipment of HMC Completed at Coburn Project, page-97
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STA (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $138.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
STA (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online