GT stands for green technology. 22 is the year. 003 is the hole number. So this is from their 3rd hole.
The black are darker metasediments of some kind as they have bedding.
Each core run is approximately 2.5m. And the felsic intrusive which is the likely host of your pegmatites begins at 231m and goes to about 252m. So a 21m pegmatite intercept. I can tell you now the whole intercept is not spodumene, however there is spodumene in it.
The occasional wooden blocks you see are every 3m, generally the same length as a rod string used to drill the core.
- Forums
- ASX - By Stock
- GT1
- Ann: Seymour Drilling Update
Ann: Seymour Drilling Update, page-29
-
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GT1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.0¢ |
Change
-0.001(1.10%) |
Mkt cap ! $31.74M |
Open | High | Low | Value | Volume |
9.1¢ | 9.3¢ | 9.0¢ | $8.701K | 94.58K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 14734 | 9.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.9¢ | 197621 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 14734 | 0.094 |
2 | 22677 | 0.090 |
2 | 36390 | 0.088 |
1 | 50740 | 0.086 |
4 | 141000 | 0.085 |
Price($) | Vol. | No. |
---|---|---|
0.099 | 197621 | 1 |
0.100 | 196021 | 1 |
0.105 | 179332 | 2 |
0.110 | 95000 | 1 |
0.115 | 85526 | 1 |
Last trade - 15.47pm 30/09/2024 (20 minute delay) ? |
Featured News
GT1 (ASX) Chart |