OMH 4.44% 47.0¢ om holdings limited

Ann: Share Placement to JFE Shoji Corporation, page-43

  1. 12,100 Posts.
    lightbulb Created with Sketch. 1758
    Since Feb 2020 OM Sarawak has been operating at reduced capacity due to raw material supply problems, then Covid staff problems, furnace conversions and furnace maintenance. The power contract PPA is a take or pay agreement so with the reduction of production means that the power still needs to be paid for.
    The power price for 2024 is 0.153RM up 2.5% from 2023 or US$0.033/kWh. Close to a 5 year low.
    Each furnace that has been closed has cost approx US$6.5 million/year in power charges. So if an average of 5 x furnaces have been offline for the past 3 years means that US$100 million in power has been paid for that wasn't used and now in inventory to be used at a later date.
    Its a shame that OM Holdings management don't explain this clearer. Profits will increase as this power is used to produce more product.
    Using the 2024 power cost, the FeSi power component is US$300/tonne, even with lower product prices OM Sarawak is still profitable and will become more profitable now that 15 furnaces are now back in production.
 
watchlist Created with Sketch. Add OMH (ASX) to my watchlist
(20min delay)
Last
47.0¢
Change
0.020(4.44%)
Mkt cap ! $360.1M
Open High Low Value Volume
44.5¢ 47.0¢ 44.5¢ $6.948K 15.43K

Buyers (Bids)

No. Vol. Price($)
1 10000 44.5¢
 

Sellers (Offers)

Price($) Vol. No.
48.5¢ 11740 2
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
OMH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.