M4M 3.23% 3.0¢ macro metals limited

Ann: Share Placement, page-110

  1. 60 Posts.
    lightbulb Created with Sketch. 1
    Testwork on smelting is due out end of February and then converting of testwork due end of April.
    Then onto the flow sheet design and report, ultimately all leading to a DFS.
    Sit tight, all in good time
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.001(3.23%)
Mkt cap ! $107.9M
Open High Low Value Volume
3.1¢ 3.1¢ 3.0¢ $103.4K 3.394M

Buyers (Bids)

No. Vol. Price($)
5 310162 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 115652 2
View Market Depth
Last trade - 13.30pm 22/07/2024 (20 minute delay) ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.