CXO 4.21% 9.1¢ core lithium ltd

Ann: Share Purchase Plan and Application Form, page-202

  1. 1,338 Posts.
    lightbulb Created with Sketch. 218
    This EIS is specifically for the 3-4 year LOM initially applied for. If the volumes, durations or any other part of the mining operations are to change, this must be addressed in the MMP and if accepted, then technically CXO could manage change through that MMP. If not, literally each and every change would need to pass through EIS review processes as the geography of additional deposits is different, and may have its own unique characteristics which must be catered for. Do not be so naive as to think this EIS review is anything but specifically related to the EIS provided by CXO, not one tonne more.
 
watchlist Created with Sketch. Add CXO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.