The deposit has double in size since the 31/1/2017 PFS. Further drilling and identified targets should push JORC to ~50m tonnes, in the near future.
Hopefully, the would input a NPV for the project this time around.
It going to cost less that $50 mill USD to get stage 1 (and that is with a +/-30% contingency), up and running... snagging a off-take partner, a few bucks from a CR, and a few buck through a loan.... and its, up up and away.